{"id":3924,"date":"2024-04-16T10:46:48","date_gmt":"2024-04-16T10:46:48","guid":{"rendered":"https:\/\/www.pilbeamconstruction.co.uk\/?post_type=dt_portfolio&p=3924"},"modified":"2024-04-16T10:48:05","modified_gmt":"2024-04-16T10:48:05","slug":"st-marys-church-horsham","status":"publish","type":"dt_portfolio","link":"https:\/\/www.pilbeamconstruction.co.uk\/project\/st-marys-church-horsham\/","title":{"rendered":"St Mary\u2019s Church, Horsham"},"content":{"rendered":"
[vc_row margin_top=”0″ margin_bottom=”0″ padding_left=”0″ padding_right=”0″ animation=”” type=”” bg_color=”” bg_position=”top” bg_repeat=”no-repeat” bg_cover=”false” bg_attachment=”false” padding_top=”0″ padding_bottom=”0″ enable_parallax=”” parallax_speed=”0.1″ bg_video_src_mp4=”” bg_video_src_ogv=”” bg_video_src_webm=””][vc_column animation=””][vc_column_text]<\/p>\n
[\/vc_column_text][vc_empty_space][\/vc_column][\/vc_row][vc_row margin_top=”0″ margin_bottom=”0″ padding_left=”0″ padding_right=”0″ animation=”” type=”” bg_color=”” bg_position=”top” bg_repeat=”no-repeat” bg_cover=”false” bg_attachment=”false” padding_top=”0″ padding_bottom=”0″ enable_parallax=”” parallax_speed=”0.1″ bg_video_src_mp4=”” bg_video_src_ogv=”” bg_video_src_webm=”” css=”.vc_custom_1603275461474{margin-bottom: 30px !important;}”][vc_column width=”1\/3″ animation=””][vc_column_text]<\/p>\n
Client:<\/b><\/td>\n | The PCC St Mary\u2019s Church<\/td>\n<\/tr>\n |
Architect:<\/b><\/td>\n | John D Clarke<\/td>\n<\/tr>\n |
Mechanical:<\/b><\/td>\n | SMS (Southern) Ltd<\/td>\n<\/tr>\n |
Electrical:<\/b><\/td>\n | Bradbury Electrical Contractors Ltd<\/td>\n<\/tr>\n |
Underfloor Heating: \n<\/b><\/td>\n | Jupiter Underfloor Heating Company Ltd<\/td>\n<\/tr>\n |
QS:<\/b><\/td>\n | Philip Harrabin Consultancy Ltd<\/td>\n<\/tr>\n |
Value:<\/b><\/td>\n | \u00a3103,894.00<\/td>\n<\/tr>\n |
Programme:<\/b><\/td>\n | 6 weeks<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n <\/p>\n St Mary\u2019s Church is a Grade 1 listed building with parts dating from 1247, the interior having been altered more frequently to reflect fashion & need.<\/p>\n The brief involved the removal of the existing pews, suspended timber floor & adjacent radiators. The resultant exposed sub floor was excavated to the prescribed level, this was then progressively filled with an insulation system in preparation for the underfloor pipework. Following this work ceramic tiling & screed topping was installed. To this 25mm Clipsham Stone tiles were laid with a 100mm edging detail abutting the existing Victorian tiled floor.[\/vc_column_text][\/vc_column][vc_column width=”2\/3″ animation=””]\n |