Industrial
A recent scheme involved constructing a new 900m2 portal framed building on a greenfield site, including extensive concrete paving and roadways – all designed and delivered to a very tight schedule.
Other new builds include 2- storey offices alongside a large warehouse, equipped with specialist air conditioning; and the extension and alterations to a structural steel workshop and offices, doubling the size of their facilities whilst maintaining their operations throughout the work.